Connect

Patient Monitor

01 — Overview

Project Overview & Fast Facts

In an Intensive Care Unit (ICU), physicians and nurses evaluate critically ill patients under constant stress. Traditional bedside monitors scatter vital signals, infusion rates, and renal output across separate hardware screens or nested sub-menus, forcing clinicians to mentally piece data together while dealing with non-stop nuisance alarms.

This project unifies four critical physiological modalities: Primary Vitals, Smart IV Infusions, BP/MAP, and Renal Excretion; onto a single, zero-scroll landscape viewport. By embedding international medical safety standards directly into the UI architecture, the system reduces cognitive fatigue and speeds up clinical decision-making.

Fast Facts

Target Users

Physicians & Bedside Registered Nurses

Setting

Critical Care / Intensive Care Unit (ICU)

Focus Areas

Distance Ergonomics, Alarm Fatigue Control, Hazard Mitigation

Regulatory Scope

IEC 62366-1 • ANSI/AAMI HE75 • WCAG 2.1 AA

Medical Device Software

Medical Device Software

HCLTech & Becton, Dickinson and Company (BD)

HCLTech & Becton, Dickinson and Company (BD)

02 — Challenges

Key Clinical Challenges Addressed

01

Cognitive Overload

Physiological metrics exist in isolated hardware silos, forcing clinicians to manually cross-reference data under pressure.

02

Alarm Fatigue

Misuse of yellow/amber warning states for routine readings desensitises clinicians, leading to delayed emergency responses.

03

Medication Label Truncation

Small UI cards truncate critical drug names (e.g., Amiodarone...), violating usability guidelines and risking lethal mix-ups.

04

Distance Legibility Gaps

Primary vitals cannot be reliably read from across the room (1-3 meters) during rapid room entry assessments.

03 — Contact

Interested in learning more?

I would be glad to discuss the design decisions, clinical considerations, and safety trade-offs behind this project during an interview.

02

Alarm Fatigue

Misuse of yellow/amber warning states for routine readings desensitises clinicians, leading to delayed emergency responses.

04

Distance Legibility Gaps

Primary vitals cannot be reliably read from across the room (1-3 meters) during rapid room entry assessments.

Connect

Patient Monitor

01 — Overview

Project Overview & Fast Facts

In an Intensive Care Unit (ICU), physicians and nurses evaluate critically ill patients under constant stress. Traditional bedside monitors scatter vital signals, infusion rates, and renal output across separate hardware screens or nested sub-menus, forcing clinicians to mentally piece data together while dealing with non-stop nuisance alarms.

This project unifies four critical physiological modalities: Primary Vitals, Smart IV Infusions, BP/MAP, and Renal Excretion; onto a single, zero-scroll landscape viewport. By embedding international medical safety standards directly into the UI architecture, the system reduces cognitive fatigue and speeds up clinical decision-making.

Fast Facts

Target Users

Physicians & Bedside Registered Nurses

Setting

Critical Care / Intensive Care Unit (ICU)

Focus Areas

Distance Ergonomics, Alarm Fatigue

Control, Hazard Mitigation

Regulatory Scope

IEC 62366-1 • ANSI/AAMI HE75 • WCAG 2.1 AA

Medical Device Software

HCLTech & Becton, Dickinson and Company (BD)

02 — Challenges

Key Clinical Challenges

01

Cognitive Overload

Physiological metrics exist in isolated hardware silos, forcing clinicians to manually cross-reference data under pressure.

02

Alarm Fatigue

Misuse of yellow/amber warning states for routine readings desensitises clinicians, leading to delayed emergency responses.

03

Medication Label Truncation

Small UI cards truncate critical drug names (e.g., Amiodarone...), violating usability guidelines and risking lethal mix-ups.

04

Distance Legibility Gaps

Primary vitals cannot be reliably read from across the room (1-3 meters) during rapid room entry assessments.

03 — Contact

Interested in learning more?

I would be glad to discuss the design decisions, clinical considerations, and safety trade-offs behind this project during an interview.